- CONTEXT.md: Delivery Destination, SQL Delivery, Delivery Operation, ETL Activation - ADR 0023: separate delivery operations from finalized sessions (#41) - ETL integration study and SaaS/MCP feasibility study Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
1.6 KiB
Separate delivery operations from finalized SQL sessions
status: accepted
For Studio integrazione in ETL — ticket #41, SQL file delivery and ETL integration have a lifecycle separate from the session that produced the approved SQL. A session can finalize while its linked Delivery Operation remains pending or has failed. The operation stays visible and can be retried without reopening the session or changing its canonical artifacts or terminal state.
Keeping the session incomplete until the destination becomes available was considered and rejected: destination failures should not require repeating or reopening completed SQL work. The cost of this choice is two explicit outcomes in the user experience and persistence model. An approved SQL query or finalized session must never be presented as evidence of a successful delivery, activation or execution.
ETL Activation requires an explicit choice by a user authorized for the destination. It is distinct from artifact delivery and immediate execution. The same user who approved the SQL may activate it when authorized; otherwise activation waits for an authorized responsible user. There is no universal requirement for a second approver.
This records the boundary accepted in interview rounds 1 and 2, not an implementation claim. Operation states, durable dispatch, retry semantics, approval binding and the remote integration protocol remain to be specified. The existing After-finalize hook vocabulary does not by itself provide the required delivery infrastructure.